www
Skip to Content Navigation
The source file is in the Intranet. Any change made to this page will be overwritten by the update from Intranet.

Cecil Rhodes #2


​Description of Energy and Water Reduction Measures

 
Date
Improvement Measures
2009
Programmed Parking Lot Plugs installation
2012
Heating/Cooling System Upgrade (new high efficiency boiler)
2012
Interior Lighting Retrofit (energy saving fixtures installation)
2012
Gym Lighting Retrofit
2012
Occupancy Sensors Installation
2013
Building Envelope Upgrades (seal & caulk door & window penetrations)
2013
Water Conservation (low water consumption fixtures installation)
2013
Building Management System Implemented (heat & ventilation controls)
​2015​Exterior Lighting Retrofit (efficient LED lights)
​2016
​Change Room Lighting Upgrade

 

 

Energy and Water Consumption Graphs​

Paper Graphs

share

Useful Links

Resources

Contact Us