www
Skip to Content Navigation
The source file is in the Intranet. Any change made to this page will be overwritten by the update from Intranet.

Grosvenor


Description of Energy and Water Reduction Measures

Date

Improvement Measures

2006

Complete Window Replacement

2008

Interior Lighting Retrofit (energy saving fixtures installation)

2008

Gym Lighting Retrofit

2009

Building Envelope Upgrades (seal & caulk door    & window penetrations, insulate soffit area under gym)

2010

Water Conservation (low water consumption fixtures installation)

2011

Occupancy Sensors Installation

2011

Building Management System Implemented (heat & ventilation controls)

2011

Roof Replacement on portion of building

 

 

Energy and Water Consumption Graphs​​

Paper Graphs

share

Useful Links

Resources

Contact Us