www
Skip to Content Navigation
The source file is in the Intranet. Any change made to this page will be overwritten by the update from Intranet.

Lord Nelson


​Description of Energy and Water Reduction Measures

 
Date
Improvement Measures
2003
Roof Replacement on portion of building
2006
Heating / Cooling System Upgrade (replacement with high efficiency boilers)
2012
Interior Lighting Retrofit (energy saving fixtures installation)
2012
Gym Lighting Retrofit
2012
Building Envelope Upgrades (seal & caulk door    & window penetrations)
2013
Water Conservation (low water consumption fixtures installation)
2014
Occupancy Sensors Installation
2014
Building Management System Implemented (heat & ventilation controls)
​2015Exterior Lighting Retrofit (efficient LED lights)

 

Energy and Water Consumption Graphs​​​

Paper Graphs

share

Useful Links

Resources

Contact Us