www
Skip to Content Navigation
The source file is in the Intranet. Any change made to this page will be overwritten by the update from Intranet.

Tec-Voc


Description of Energy and Water Reduction Measures

 

Date
Improvement Measures
2005
Interior Lighting Retrofit (energy saving fixtures installation)
2005
Gym Lighting Retrofit
2006
Building Envelope Upgrades (seal & caulk door & window penetrations)
2007
Water Conservation (low water consumption fixtures installation)
2007
Occupancy Sensors Installation
2007
Building Management System Implemented (heat & ventilation controls)
2007
Heating / Cooling System Upgrade (new high efficiency boilers)
2007
Heating / Cooling System Upgrade (passive solar wall installation)
2008
Programmed Parking Lot Plugs installation
2009 & 2012
Roof Replacement on portions of building
2004 – 2013
Window Replacements on portions of building
2015​​Roof Replacement on portion of building
​2016
​Gym Lighting Upgrade
​2016
​Carpentry Shop LIghting Upgrade
​2016
​Roof Replacement on portions of building

 

 

Energy and Water Consumption Graphs​​​​

Paper Graphs

share

Useful Links

Resources

Contact Us