www
Skip to Content Navigation
The source file is in the Intranet. Any change made to this page will be overwritten by the update from Intranet.

Wellington


Description of Energy and Water Reduction Measures

 
Date
Improvement Measures
2003
Interior Lighting Retrofit (energy saving fixtures installation)
2003
Gym Lighting Retrofit
2003
Building Envelope Upgrades (seal & caulk door & window penetrations)
2004
Water Conservation (low water consumption fixtures installation)
2005
Occupancy Sensors Installation
2005
Building Management System Implemented (heat & ventilation controls)
2013
Roof Replacement on portion of building
​2016
​New Steam Boiler

 

 

Energy and Water Consumption Graphs​​​​

Paper Graphs

share

Useful Links

Resources

Contact Us