www
Skip to Content Navigation
The source file is in the Intranet. Any change made to this page will be overwritten by the update from Intranet.

Wolseley​


​Description of Energy and Water Reduction Measures

 
Date
Improvement Measures
2003
Roof Replacement on portion of building
2003
Window Replacement on original building
2007
Interior Lighting Retrofit (energy saving fixtures installation)
2009
Programmed Parking Lot Plugs installation
2009
Building Envelope Upgrades (seal & caulk door & window penetrations)
2011
Building Management System Implemented (heat & ventilation controls)

 

Energy and Water Consumption Graphs​​​

Paper Graphs

share

Useful Links

Resources

Contact Us