Robert H. Smith
August 12, 2021
Description of Energy and Water Reduction Measures
Date | Improvement Measures |
---|---|
2005 | Heating / Cooling System Upgrade (new high efficiency boilers) |
2009 | Interior Lighting Retrofit (energy saving fixtures installation) |
2010 | Water Conservation (low water consumption fixtures installation) |
2011 | Building Management System Upgraded (heat & ventilation controls) |
2012 | Roof Replacement Project on portion of building |