Skip to main content

Tec-Voc

August 20, 2021

Description of Energy and Water Reduction Measures

Date
Improvement Measures
2005
Interior Lighting Retrofit (energy saving fixtures installation)
2005
Gym Lighting Retrofit
2006
Building Envelope Upgrades (seal & caulk door & window penetrations)
2007
Water Conservation (low water consumption fixtures installation)
2007
Occupancy Sensors Installation
2007
Building Management System Implemented (heat & ventilation controls)
2007
Heating / Cooling System Upgrade (new high efficiency boilers)
2007
Heating / Cooling System Upgrade (passive solar wall installation)
2008
Programmed Parking Lot Plugs installation
2009 & 2012
Roof Replacement on portions of building
2004 – 2013
Window Replacements on portions of building
2015Roof Replacement on portion of building
2016
Gym Lighting Upgrade
2016
Carpentry Shop Lighting Upgrade
2016
Roof Replacement on portions of building
2018
Roof Replacement Project
2020Lighting Retrofit (Gym, MR, Dental Lab, Bake shop)
2020Exterior/Parking Lot Lighting Retrofit
2020Building Envelope Upgrades (Window Replacement)


Andrew Mynarski Electricity Graph.png

Andrew Mynarski Gas Graph.png

Andrew Mynarski Water Graph.png

Andrew Mynarski Paper Graph.png

Back to top